LION 800 CONSTRUCTION PART 3

April 21-22

Pasting of the yacht deck with a second layer of fiberglass.

The yacht has been glued with fiberglass, the first layer of the deck was ground, degreased and covered with a second layer of fiberglass based on epoxy resin.
The next stage is the finishing putty of the yacht deck and painting.

Tagged ,