Day: August 28, 2017

LION 800 CONSTRUCTION PART 3

August 19-20 Removing the boat from the slipway Before removing the boat from the pile in a horizontal position, the waterline position was marked on the hull. For rolling out the hull of the yacht, two temporary transport carts were made from improvised materials, the carts were fixed to the hull of the yacht in […]

Read more