CONSTRUCTION LION 800 PART 4

August 2018

Preparing for deck painting

The external hatches of lockers and covered with epoxy fiberglass are installed in regular places on the deck. The masking tape is pasted over, marked up on the slipway with the help of a laser level of a waterline, after which the yacht is primed and painted.

Leave a Reply