CONSTRUCTION of LION 550 ADRENALINE

Day Six

Setting the straps

Forced simple, in anticipation of delivery of ordered materials, fiberglass, epoxy and the second part of the cutting.
But the work continues, took several hours to install the straps for fixing the lining of the lockers in the case.
Straps are made of slats with a section of 30×30 pine attached to the edge of the frame cutout, fastened to the epoxy adhesive by screwing.

Tagged , , ,

2 thoughts on “CONSTRUCTION of LION 550 ADRENALINE

  1. Hola quisiera saber si venden planos para construir en casa. Soy de argentina. Me interesan el modelo lion 5.50 y el 6,oo.gracias

    1. Hola Marco, estaré feliz si en Argentina hay yates que diseño. Estoy listo para enviar dibujos de mis yates a cualquier país.

Leave a Reply