Lion 800 construction

11-12 March 2017

Work continues on the construction of the yacht. installing longitudinal set. Stringers are laminated design and is glued together from two strips, then the edges of the stringers planed planed for a tight fit to the outer skin. Forsting installed, are being installed keel beam .

To be continued.