LION 800 CONSTRUCTION PART 2

July 22
Putty for the yacht, part two.

The surface of the yacht’s housing is completely leveled with putty, after that the putty is ground, for grinding a flexible strip, about one meter long with coarse grinding paper fixed on it, is used. The process of grinding allows you to level the surface and reveal small irregularities, which will subsequently be embedded in the second finishing layer of putty. After applying the second layer of putty, the body is ground with a flexible strip with a coarse-grained sandpaper, for leveling the surface.
The field of this is the grinding of the machine case with a fine-grained sandpaper.

 

Tagged , , ,

2 thoughts on “LION 800 CONSTRUCTION PART 2

  1. how many layers of glass will you be doing?

    1. The yacht is covered with two layers of fiberglass with a density of 300 gr.m2

Leave a Reply